Roof replacement is a big project happening on top of your home. Knowing what to expect day-by-day makes the process less stressful and helps you spot if anything’s going wrong. Here’s what a typical Tampa Bay shingle replacement looks like from prep through close-out.
1-2 weeks before: Prep and permit
After you sign the contract:
- Permit application: we submit to your local building department. Turnaround is typically 1-3 business days for straightforward residential permits
- Material ordering: shingles, underlayment, drip edge, flashing, ridge cap, vent products, ordered specific to your job
- Weather monitoring: we watch the 10-day forecast leading up to your install
- Confirmation call 2 days out: we call to confirm the install date and prep steps for you
Day before: What YOU do
Prep steps we ask you to complete:
- Move vehicles out of the driveway (the crew needs staging space for materials and dumpster)
- Remove wall hangings in rooms below the roof: impact vibration during tear-off can shake pictures off walls
- Cover valuables in the attic if you have items stored up there: dust falls during tear-off
- Confirm pets can be secured away from the work area on install day
- Notify neighbors that there may be noise 7am-6pm the following day
Day 1: Tear-off + underlayment
Arrive time: 7:00-7:30 AM for the crew and dumpster delivery
Morning (7am-noon):
- Property protection: plywood or heavy tarps around the perimeter to protect landscaping
- Existing roof tear-off begins
- Debris drops directly into the dumpster
- Deck inspection: any rot or damaged plywood identified and replaced (documented with photos and priced separately if not already in scope)
Afternoon (noon-6pm):
- Underlayment installation: synthetic underlayment across the field, peel-and-stick self-adhering at valleys, eaves, and penetrations
- Drip edge installation at eaves and rakes
- Building department dry-in inspection scheduled (they verify code-compliant deck attachment and underlayment)
End of day 1: your roof is “dried in”, weather-tight even without the final shingles installed. Safe overnight.
Day 2: Shingle installation (single-story straightforward home)
Morning: Shingle installation begins from the bottom row and works upward. Flashing at penetrations (chimneys, plumbing vents, skylights) installed as each area is reached.
Afternoon: Ridge cap installation. Ridge vent installation. Final touches on flashing details.
Day 2 end-of-day walkthrough: we walk the completed roof with you before crew leaves.
Day 3+: Multi-story or complex roofs
Complex-geometry homes with dormers, multiple planes, or multi-story access typically take 3-5 days. Day-by-day progress:
- Day 3: continued shingle installation on remaining planes
- Day 4: flashing details, ridge cap, ridge vent
- Day 5: final touches, clean-up, walkthrough
Tile or metal roofs take longer:
- Tile: 5-7 days depending on complexity
- Standing-seam metal: 4-6 days for panel installation
Final day: Clean-up + close-out
- Magnetic sweep of the property for fallen fasteners
- Debris removal: dumpster hauled away
- Landscape protection materials removed
- Final walkthrough with you
- Building department final inspection scheduled
1-2 weeks after: Permit close-out
- Building department final inspection (typically passes on first try)
- Certificate of Completion issued
- GAF warranty registered with the manufacturer in your name
- Wind Mitigation Inspection scheduled with Tampa Inspection Company (once the project is completed and paid in full)
- Warranty paperwork delivered to you for your records
Things that might change the schedule
- Weather: unexpected rain can pause tear-off (safety) and shingle installation
- Discovered damage: extensive deck rot found during tear-off can add a half-day for repair
- Building department: inspection scheduling delays
- Custom material orders: designer shingle colors or specialty products may add lead time
We commit to timeline in writing before starting and communicate any changes as they happen.
What we do that other contractors don’t
- Written scope of work with material specs: you know exactly what’s being installed
- Day-by-day photo documentation for your records
- Permit close-out with Certificate of Completion (not just permit pull)
- Warranty registration in your name with the manufacturer
- GAF Master Elite installation, required for Golden Pledge warranty eligibility
- Post-project follow-up at 30 days to confirm satisfaction
Ready to schedule your roof replacement? Call 813-344-1622 or request an estimate online.
Related Reading
- Roof Installation & Replacement Services
- Florida Shingle Roof Cost Guide
- Roofing Warranty Guide
- Florida Roof Permit Process
About the Author
Cory Schools is the founder and owner of Lionheart Roofing, a GAF Master Elite Contractor based in Valrico, FL. Read Cory’s full bio.