Condominium & HOA Boards
Built for Boards That Have to Show Their Work
Lionheart Roofing is a family-owned, GAF Master Elite roofing contractor serving condominium and homeowners’ associations across Tampa Bay (free roof condition reports, repairs, and full reroofs) from our office at 1105 Seffner Valrico Rd in Valrico.
A board does not buy a roof the way a homeowner does: owners will ask why you chose the bid you chose. GAF Master Elite is a credential held by fewer than 2% of all roofing contractors. We are FL Certified Roofing Contractor CCC1335262, fully insured, with decades of combined experience, and we re-roofed every building at the MIDFLORIDA Credit Union Amphitheatre. The project manager who writes your estimate is the one your board deals with until the work is done.
Call or Text 24/7: (813) 344-1622

Start Here
Who Owns the Roof, and Who Pays
In a condominium, the association. A roof is a common element, and Fla. Stat. §718.113(1) provides that “[m]aintenance of the common elements is the responsibility of the association, except for any maintenance responsibility for limited common elements assigned to the unit owner by the declaration.”
In townhouse-style buildings a roof over one unit can be a limited common element, and the declaration decides who maintains it. The cost is a common expense; §718.112(2)(f)2.a. names roof replacement among the reserves a budget must include, with the roof first on the structural integrity reserve study list (§718.112(2)(g)1.). A condominium roof is a scheduled purchase, not a crisis.
In an HOA, it depends on the declaration. Chapter 720 allocates roof responsibility nowhere. Usually the roof belongs to the member; in villa, townhome and paired-home communities the declaration often hands roofs to the association instead. The maintenance article is the whole answer; we ask for it before quoting, and if it says the roofs belong to the homeowners, we say so.
The one that gets a board blamed. Like for like is maintenance. Changing material, profile or color can be a material alteration: under §718.113(2)(a), absent a declaration procedure, 75 percent of the total voting interests must approve it before commencement. We flag any change in look in writing before material is ordered.
The Bid Statutes
What Has to Go Out for Bids, and What Does Not
Both statutes require every service contract to be in writing regardless of amount, so a verbal “go ahead and patch that” is not compliant. Above the threshold, bids are required as well.
§718.3026(1) triggers them for a condominium where a contract “exceeds 5 percent of the total annual budget of the association, including reserves,” measured “on behalf of any condominium operated by the association”: six condominiums under one manager are measured separately. For an HOA the figure is 10 percent, but §720.3055(2)(a)2.
lets a declaration’s own bidding provisions govern if they are not less stringent, and many set a far lower trigger.
Below the threshold, no bids are required by statute. Emergency work is protected by a savings clause, not an exemption: both statutes say only that “Nothing contained herein is intended to limit the ability of an association to obtain needed products and services in an emergency.”
“Nothing contained herein shall be construed to require the association to accept the lowest bid.” §718.3026(1); §720.3055(1) says the same. The law lets your board choose on scope and qualifications. What it does not do is write down why. That part is the packet.
On phasing. Multi-building communities can usually be reroofed one at a time: reserves that fund in stages, one roof leaking while the rest have years left, parking that must stay usable. But phasing is a funding decision, not a way under a threshold: we write it as one contract with a building-by-building sequence the board can compare.
The Packet
What a Board Needs in Front of It
The Roof File
A written condition report per building: age, photos of the deficiencies, drainage, and an opinion of the remaining useful life. Free, yours either way, and it feeds the reserve study you already maintain.
The Scope, With Exclusions
A free written itemized estimate, valid 30 days so it survives a board cycle, stating what is not included as plainly as what is. Deck inspected and re-nailed to Florida Building Code, wood replacement photographed and counted, no change order without priced written approval.
The Paperwork You Sign
Permit pulled and closed. The Notice of Commencement is the owner’s act: an authorized officer or director signs it before a notary, and it is recorded and posted before the first inspection. We prepare it and walk you through it.
Statutes here were checked against the 2026 Florida Statutes in September 2026: a summary, not legal advice.
Google Reviews
What Homeowners Actually Wrote
5.0 stars from 80+ Google reviews, word for word, with dots where we left a sentence out.
★★★★★“… My home needed a full roof replacement and was referred to Cory. After contacting Cory, he came over within a day to provide a quote and within two weeks, his team was at my house to complete the job.
The Lionheart Roofing team was efficient and able to complete the full repair in one day (two flat roofs and separate structure in addition to main house). Cory was transparent, available, and reliable. …”
Jeffrey H. · Google review
★★★★★“Highly recommend Lionheart Roofing. They were very responsive in scheduling my repair, helped me understand what the issue was and why, and fixed it in a timely manner. Definitely will use Lionheart Roofing again for any roofing issues I have in the future.”
Andrewl89 · Google review
★★★★★“I can’t thank Cory enough. … We talked over the pros and cons of repair VS replacement with no upsell tactics involved. He came out and made needed repairs before the next rainfall and did a super job. …
Eventually the roof will need replacement, but on my terms. … I don’t trust anyone else at this point. …”
Donsengine · Google review
At the Meeting
What We Bring When We Present to Your Board
One named project manager: the same person who walked the roofs, wrote the estimate, and will be your board’s one contact until the project is complete. He comes to the meeting, answers the questions in the room, and stays reachable afterwards so residents call us rather than your office. He brings the certificate of insurance for General Liability and Workers’ Compensation, the W-9, and the license verification your vendor portal wants. If your documents require the association named as an additional insured, tell us and we will have our agent issue it.



Board-Level Questions
Start With the Roof File, Not the Bid
A free written roof condition report, building by building, with photographs and our opinion of the remaining useful life on each roof. You keep it whether or not you hire us; it is the document your reserve study wants, and the cheapest way to learn whether you have a roof problem or a five-years-from-now problem.
Call or Text 24/7: (813) 344-1622
Lionheart Roofing LLC · 1105 Seffner Valrico Rd, Valrico, FL 33594 · FL Certified Roofing Contractor CCC1335262 · Fully insured (General Liability + Workers’ Compensation)